منزل المنتجاتقطع غيار معدات البناء

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

شهادة
نوعية جيدة هيدروليّ زحّاف حفار للمبيعات
نوعية جيدة هيدروليّ زحّاف حفار للمبيعات
Thanks for all your cooperation, the more orders, the better service.....

—— Johnny Benson

Yesterday, we cooperated and trusted each, tomorrow, we share the same breath for win-win. My friend, thank you.

—— Charles Soludo

Since We choose your factory and trucks, we are in good way!

—— HADJADJ EL-HASSEN

Nous sommes une entreprise en Togo, nous avons bien collaboré avec SINOTRUK KOGEL depuis 7 ans. Grace à son support, nous possèdons un très bon marché

—— Dinga

ابن دردش الآن

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

الصين Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction المزود
Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction المزود Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction المزود

صورة كبيرة :  Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

تفاصيل المنتج:

Place of Origin: China
اسم العلامة التجارية: XGMA
إصدار الشهادات: ISO 9001:2008
Model Number: Earth Pressure Balance(EPB)TBM

شروط الدفع والشحن:

Minimum Order Quantity: 1
الأسعار: Negotiable
Packaging Details: Seaworthy packing will comply with international standards, which is suitable for sea transportation and land transportation
Delivery Time: 18 months after receiving advanced payment
اتصل
مفصلة وصف المنتج
تسليط الضوء:

construction equipment parts

,

heavy equipment parts

Description:

 

Earth Pressure Balance(EPB)TBM

When an EPB TBM bores, its cutter head in front rotates to excavate the soil into the muck chamber. When the chamber is full of mucks, its passive earth pressure is basically the same as the earth and water pressure exerted on the cutting face; resultantly, the balance of the face is realized and maintained (i.e. the faceis dynamically stable).

 

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

 

 

 

 

 

 

 

 

 

 

 

 

تفاصيل الاتصال
Shandong Sinomtp Construction Equipment Company Limited

اتصل شخص: libaiyan

إرسال استفسارك مباشرة لنا (0 / 3000)